Sep. 30th, 2024

solarbird: our bike hill girl standing back to the camera facing her bike, which spans the image (biking)

Greater Northshore Bike Connector Map 1.4.1 – 30 September 2024 – is now available on github, as is MEGAMAP 1.4.1, a pasteup of Greater Northshore, City of Seattle, 2 Line Eastside Bike Connector, and a little bit of King County Regional Trails to get us all the way to the south end of Lake Washington.

The Greater Northshore Bike Map version 1.4.1 (September 2024), in low-resolution preview.

New in this release:

  • Updated/added bike locker locations
  • Three missing blocks of bike lane and sharow in Lake Forest Park
  • Two new blocks of bike lane near Shoreline South station
  • Most of the shoulder on Woodinville-Duvall Road is not officially bike lane, turns out one section between 156th and 171st is official, so added
  • I-405 in blue, which matched the colour used by 2 Line Bike Connector Map, was too easily confused with water so was changed to an intensity-matched grey
  • Other small cosmetic adjustments

If you enjoy these maps and feel like throwing some change at the tip jar, here’s my patreon. If you have an iPhone, please use the website interface and not the app, because Apple takes 30% if you use the app. I’ll keep doing this regardless, but you know. ^_^

Posted via Solarbird{y|z|yz}, Collected.

June 2025

S M T W T F S
1 234 5 67
891011121314
15161718192021
22232425262728
2930     

Most Popular Tags